Halverson Construction
620 N. 19th Street
Springfield, IL 62702

Phone: 217-753-0027
Fax: 217-753-1904

Contact Us

Project of the Year

Welcome Video


Illinois River Bridges

Click picture for close up view




Murray Baker Bridge | Peoria, Illinois

Removal and replacement of the North approach spans to the Murray Baker Bridge carrying Interstate 74 over the Illinois River in Peoria, Illinois. The project also includes: rehabIllinois Routeitation of the truss spans; replacement of 16 truss pins; replacement of a truss bearing; and complete removal and shoring of 180 ft of the truss span to accommodate the construction of reconfigured on/off ramps to Interstate 74. Subcontractor to United Contractors Midwest.

Contract Value: $11,500,000
Completion Date: October 2005
Owner: Illinois Department of Transportation
Location: Peoria, Illinois
Architect / Engineer: Alfred Benesch & Company






Morris, Illinois | Illinois Route 47

Construction of the new 1,730 foot long, 5-span southbound bridge carrying Illinois Route 47 over the Illinois River at Morris, Illinois. The project included: construction of four new river piers with caisson shafts to bedrock; over 1,200 cubic yards of new substructure concrete; 1,850 cubic yards of bridge deck concrete; approximately 750,000 pounds of reinforcing steel; and over 5.6 million pounds of new structural steel. General Contractor.

Contract Value: $11,750,000
Completion Date: November 2002
Owner: Illinois Department of Transportation
Location: Morris, Illinois
Architect / Engineer: Teng & Associates, Inc.






Cedar Street Bridge | Peoria, Illinois

Rehabilitation of the 34-span, 3,600 foot long Cedar Street Bridge carrying Illinois Route 29 &116 over the Illinois River, at Peoria, Illinois. The project consisted of: structural steel repairs to the truss & girder spans of the bridge; pin replacements over the river span; substructure repairs; removal and replacement of bridge expansion joints; and rivet removal & replacement. Subcontractor to Eagle Painting & Maintenance Co.

Contract Value: $3,200,000
Completion Date: October 2002
Owner: Illinois Route Dept of Transportation
Location: Peoria, Illinois
Architect / Engineer: Wiss, Janney, Elstner & Associates






Florence, Illinois | Illinois Route 106

The project consisted of: removal and replacement of the existing lift span floor system; new bridge grating; painting and cleaning of existing lift span; rehab of bridge tender house; new tender house access; structural steel repairs; joint rehabilitation; and shotcrete pier repairs. Used the specialized overhead crane system to replace floor system in 1-1/2 months; used a specially designed water tank ballast system for temporary counterweight support; coordinated with painting contractor to complete project 15 days ahead of schedule. General Contractor.

Contract Value: $3,662,394
Completion Date: June 2004
Owner: Illinois Department of Transportation
Location: Florence, Illinois






Shade-Lohmann Bridge | Creve Coeur, Illinois

Rehabilitation of the Shade-Lohmann bridge carrying Interstate 474 over the Illinois River at Creve Coeur, Illinois. The project involved: structural steel repairs to the floor beam system of the river truss spans; rivet removal and replacement. General Contractor.

Contract Value: $550,000
Completion Date: June 2002
Owner: Illinois Department of Transportation
Location: Creve Coeur, Illinois




Our other projects on the Illinois River include:

  • Shippingsport, Illinois (Illinois Route 351)

  • Bob Michel Bridge | Peoria, Illinois

  • Havana, Illinois (US 136)

  • Beardstown, Illinois (US 67)

  • Valley City Eagle Bridges (Interstate 72)

  • Joe Page Bridge | Hardin, Illinois (Illinois Route 16)

  • Hennepin, Illinois (Illinois Route 26)

next